I am completely prepared to get roasted but I don't understand the proper way to attach them and still be able to easily adjust leader length. Long story short, do you just attach a swivel to the end at a set length and that is the way it is forever?
Long story long, got back from my friends annual birthday trip to the Cariboo. Been doing this trip for years. For the Rainbows I have always used flatfish, spoons, plugs, lucky bugs, or raps. If we were going after kokanee it was almost always with small hoochies. This trip my friend insisted on wedding rings. They worked fine but I don't understand how they last. Every time I tie a knot i use about 3-4 inches of line. They start off with a 4' leader but once you tie it on you lose 4". Cut it off and you are down 4", tie it on again and lose another 4"and so on and so on. This doesn't include if I want to run it closer to the dodger one day and further back the next. Once it's cut that is it, can't go longer. Do you just tie them to a swivel and never change leader length again?
Yes, realize there is probably a simple answer but I just can't figure it out.